Press enter to search
Second largest stadium in Saudi Arabia.
The construction of the project, which was undertaken by “Saudi Aramco”
between 2011-2014, was undertaken by the contractor firm “J.V. BESIX – Al
Muhaidib (Joint Venture)” with a total cost of 384 million €.