Ad Duwayhi Gold Mines Project (Process Water) S. Arabia

Blog Image

Ad Duwayhi Gold Mines Project (Process Water) S. Arabia

Between 2013 and 2014, “Ma’aden Gold & Base Metals Co.” The contractor of the project, whose construction was undertaken by Hanwha Engineering and Construction (South Korea). The value of the project is around $272 million.
The mine produces one hundred and eighty thousand ounces of gold a year.